Series

ZKW JZ standard configuration

Catalogue series recorded in OBAIR OB-202512A, printed pages 41-59. Literal catalogue rows remain separate from the series identity.

When to consider this equipment

Use this category for ventilation or air-handling duties. The section sequence, filtration, heating, cooling, recovery and control functions must follow the project air states.

What to include in an enquiry

Provide supply and extract airflow, outdoor and indoor design conditions, external static pressure, filtration class, heating and cooling duties, dimensions and service constraints.

Verified technical data

Detailed dimensions and operating limits are not yet listed. Include the intended duty so the configuration can be checked.

Manufacturer source

On request

3D model not yet available

Selection from project conditions is available on enquiry